CNC
Milling
Cutting
Turning
Fabrication
Engineering
Grinding
Welding
Assembly
Repair
Drilling
ISO Certified
Laser
Plasma
Waterjet
Oregon Natural Stone LLC
78158 OR-99, Cottage Grove, Oregon, , United States
Cook's Fabrication
32922 Camas Swale Rd, Creswell, Oregon, , United States
King Welding & Repair LLC
260 S Mill St, Creswell, Oregon, , United States
ASF Ironworks Inc.
675 Wilson St, Eugene, Oregon, , United States
Elliott's Specialty Sheet Mtl
4030 W 1st Ave #200, Eugene, Oregon, , United States
Carothers & Son Ltd
75 S Bertelsen Rd, Eugene, Oregon, , United States
Synergy Brewing Systems
86896 Territorial Hwy, Veneta, Oregon, , United States
ASF Ironworks Inc.
675A Wilson St, Eugene, Oregon, , United States
Farwest Steel Corporation
2000 Henderson Ave, Eugene, Oregon, , United States
Shamrock Steel Fabricators Inc
4125 McDougal Ln, Eugene, Oregon, , United States
Harold Simpson Machinery
36417 Brand S Rd, Springfield, Oregon, , United States
Scholz Family Fabricators
1195 W 19th Ave, Eugene, Oregon, , United States
Precision Ball & Gauge
1417 Wimbledon Pl, Springfield, Oregon, , United States
Brewdog Brewing Systems LLC
6399, 6353 D St, Oregon, , United States
KiwiFab Inc.
1250 S Bertelsen Rd, Eugene, Oregon, , United States
Harvest Valley Specialties
3498 W 1st Ave #5, Eugene, Oregon, , United States
Smith Sheet Metal
253 S 15th St, Springfield, Oregon, , United States
Hunter Fabrication & Sheet Metal Solutions
303 S 5th St #110, Springfield, Oregon, , United States
All Pro Steel & Machine
195 N 39th St, Springfield, Oregon, , United States
Bridge Brothers Welding
30042 Carol Ave, Eugene, Oregon, , United States
Took my 1970 C20 pickup in to get the exhaust worked on. Truck had mid length headers and Summit header back exhaust system for full headers installed. Needed 2 small pipes custom made to connect system to headers. Asked to have the pipes installed and the system (which was hanging in place) finalized. Employee said it would probably take about an hour of labor and current rate was $100/hour. Said it would be ready next day by noon. Next day I get a call at noon that final cost is $550. Bridge Brother's claimed it took over 5 hours of labor. Explanation given was they had to move the system 2 inches. I asked if they moved the hangers or repositioned them, they said no. So I asked how they "moved" the system then. Bridge Brothers claimed they had to "wiggle" the pipes for hours until it moved 2 inches. I never got a call or any communication that were any problems or the bill would be drastically bigger than quoted. I understand jobs can take longer than expected, but 5 times longer wit






